Aviation Museum
X-L-Air was the general contractor responsible for mechanical, electrical, and associated controls work.
This energy retrofit project involved changes to the HVAC system and its controls. Lighting was also changed.
Most of the work was done high above the museum's irreplaceable exhibits. Care had to be taken not to drop even a washer onto the aeroplane exhibits below.
Project Manager and General Contractor: X-L-Air Energy Services Ltd
Engineer: Enerpro Inc. (Montreal)
Client: Canada Science & Technology Museum Corporation