Ottawa Main Library Chiller Replacement
A retrofit project with a main focus on the removal and replacement of the existing chiller and cooling tower with a new 175 ton chiller and associated cooling tower, pumps, etc. X-L-Air was the general contractor responsible for ventilation, plumbing and HVAC piping, electrical, and controls.
General Contractor: X-L-Air
Engineer: Smith & Andersen Consulting Engineering
Client: City of Ottawa