Jean Talon - HVAC Replacement
Location: 3rd to 7th Floor and Basement
X-L-Air was the general/prime mechanical contractor responsible for the ventilation, piping and building automation system.
Project Manager: SNC Lavalin Profac
Engineer: Fox Engineering
Client: P.W.G.S.C.