St. Elizabeth School
X-L-Air was the prime mechanical contractor and was responsible for the installation of plumbing, controls, heating and air conditioning for this project.
General Contractor: McDonald Bros.
Construction Engineer: R.J. McKee Engineering Ltd.
Client: Ottawa-Carleton Catholic School Board